![air doc mechanical electrical llc air doc mechanical electrical llc](https://www.omegapowerep.com/wp-content/uploads/2017/05/electrical-contractors.jpg)
If the unit is installed externally then ensure it can be fixed to the floor, check for internal mounting requirements with the manufacturer. If there is dust/construction work then the unit should be protected. The room/area the unit will be installed into is clean and dust-free. The area being installed is not prone to flooding or ponding of water. The plinth/base is ready, flat, and level & can bear the weight of the installation. Prior to the units being installed the following should be checked. Unit and all components placed on a flat surface. Units will not have materials stacked on them.Īll ancillaries will be placed in a safe and secure location so items do not go missing or get damaged.Īll original packaging is intact and not removed. Prior to the units being placed into storage, the following should be checked. The area is well ventilated and has no risk of high humidity. The equipment will be raised off of the floor to allow airflow and stop the risk of water ingress. The surface where the equipment is to be placed is flat. The area is internal and will not be affected by the weather. If the equipment is to be placed into storage on site prior to installation there will be an inspection completed checking the following. Replace all protection that has been removed Spin the fan to ensure not damaged and out of lineĬheck all coils for damage externally and internally The external casing of the unit/s are undamagedĪll pipework connections are the correct sizeĪll ducting connections are the correct sizeĪll ancillaries are included in delivery as per the order and delivery note
![air doc mechanical electrical llc air doc mechanical electrical llc](https://www.besthvacrepair.com/uploads/1/3/4/1/13411829/published/feature-column-images4.png)
The unit nameplate and details match the purchase order Supplier's consolidated delivery ticket is available, showing all equipment and ancillaries for inspection and being used to check against.Ī copy of the order that was sent to the supplier is available for reference and is being used to check againstĮquipment is packaged and crated in separate boxes, for maximum protection Once the Air Handling Unit arrives at the site, usually delivered by a transport company, and before being accepted into storage, the following should be checked with the driver.Īny damage that is noted should be reported to the manufacturer/supplier within 3 days in writing supported with photographs.